Construction method of lead wire gabion
Published:
2022-10-08
Binding lead wire gabion lead wire gabion is net pad binding First, take out the wire gabion cage to be assembled, put this kind of material on the ground, and lay the wire gabion flat to promote it to return to its original shape
The visible sharp debris on the foundation bin should be cleaned up as much as possible to ensure that the foundation soil is scraped. For the masonry of the lead wire gabion, after the foundation warehouse is accepted, the assembly and binding of the wire cage gabion and the mesh pad can be started to ensure that the connection between the cages is firm. A gabion filled with stones or pebbles.
Lead wire gabion construction steps: lead wire gabion foundation measurement and excavation. When filling the lead wire gabion, pay attention to the height and thickness after the project is implemented. Excavate the foundation of the lead wire gabion with an excavator. The width of the foundation is 2.2m and the depth is 0.7m. After mechanical excavation, the foundation of the lead wire gabion needs to be repaired manually to ensure that the foundation is level. After laying the silk cage gabion to prepare for filling.
Binding lead wire gabion The lead wire gabion is bound with mesh pads. First take out the iron wires and gabion cages to be assembled, put these materials on the ground, and lay the iron wires and lead wire gabions flat to promote their restoration to their original shape. The second is to open the front panel, rear panel, and tail panel separately, forcing them to be in a vertical state, forming a distinctive out-of-box shape. 3. Adhere to the principle of reasonableness. When folding the wings, connect all the wire cage plates between the bulkhead and the tail plate with the front and rear wire cage plates to ensure the stability of the mutual connection.
The vertical partitions and end panels are horizontal according to the top of each side to ensure the correctness of the crease position, and use twisted wires to connect the edges of the gabion frame. Specifically, it is to use each cage as the base point and 20cm as the distance to determine the binding position, try to achieve the effect of one-time molding, and use the eight-character line to achieve the purpose of reinforcing the cage, and place it in the designated position. Connect adjacent cages with binding wires to make it a whole.
After the lead wire gabion filling and assembly work is completed, the cage should be placed in the pre-planned position. Before we carry out the lead wire gabion filling operation, we need to use steel wires to connect the edges of the adjacent blank bins to ensure that the cage can form a relatively complete structure, and then use manual filling operations to fill the stones one by one.
The packing stones should be placed in an orderly manner, and the size of the stones should be as uniform as possible. The box-shaped packing stones should be between 90 and 200 mm; the pad packing stones should be 90 to 150 mm. During the filling process, the line of the box should be adjusted reasonably to ensure that the masonry line is flat and the inclination is consistent. When the pebbles are filled beyond the water level of the river, they should be placed as evenly as possible to ensure that the pebbles are of the same size and flat. After the stone filling is completed, the cap can be sealed. The cables are selected to be tightly connected, and the distance between each other is kept at 20cm. In the process of stone loading, pay attention to the movement lightly, the threading head should face into the box, place the stone on the pad, and the edges and corners of the stone should be cut off at a lower position. After the stone filling is completed, cover the top of the wire cage and tie the cables tightly with a distance of 20cm. After the gabion is sealed, it should be filled with stone, square in shape, and firmly clamped.
key word:
Lead wire gabion
Related news
2022-12-13
Online Message
Quick Nav
Contact Us
Address: No. A7-02, Huafu Street, Raoyang Economic Development Zone, Hebei Province
Tel: 18831889815 (Manager Xu)
Web: www.gebin1688.cn
Mail: 772458770@qq.com