How to deal with flood control with flood control alloy net bag.


Published:

2019-12-12

In order to prevent and mitigate flood disasters, relevant work carried out in flood forecasting, flood control dispatching and flood control engineering application, etc. The main contents of flood control include:
1 Prepare in advance in the early stage
2 Mid-term Distribute the prepared ones to weak areas
In the later period, more attention should be paid to the dispatching and application of flood control projects such as weather situation forecast, flood regime forecast, dikes, reservoirs, sluices, flood storage and detention areas, etc., emergency rescue and disaster relief after dangerous situations and disasters, emergency measures under extraordinary circumstances, etc.
Basic meaning
Preventing flood damage in flood season and ensuring the safety of protection zone Preparation before flood season includes:
1. Training flood control personnel; Check the completion of flood control engineering facilities such as excavator rock filling work;
2. Eliminate hidden dangers; Formulate flood control plans and delivery plans;
3. Prepare sufficient flood control materials and flood control alloy net bags;
4 Establish and improve the flood forecasting and warning system

key word: